大发彩票 | English
Vibrating screen Conveyor seriesCrusher seriesspin-vibrating

National Service Hotline

400-1898-088 0373-5597320
ProductCurrent location:Home ? Product ? Spare parts series ? Storage silo silo

Product

More >
  • 5

Storage silo silo

Type:Spare parts series

Keywords:Storage warehouse of cement silo

Description:Storage silo silo is used for receiving the seal pneumatic conveying of bulk cement tank car, By storing the position of the pneumatic ash conveying pump will then be transported to the ingredients of cement silo, and through the quantitative batchin

Notice: Please specify when ordering specifications, screen surface layers, the material name, size and screen size parameters.。

Promise:

0373-5597320 15737355722

Consultation Order

Storage silo silo

Introduce

大发彩票 www.paulmartinezmusic.com 1, The principle of work:
Storage silo silo is used for receiving the seal pneumatic conveying of bulk cement tank car, By storing the position of the pneumatic ash conveying pump will then be transported to the ingredients of cement silo, and through the quantitative batching equipment below to see the tape transport machine.

2, The installation and debugging of:
The installation shall be carried out strictly in accordance with the requirements of the product installation.All the individual shipments of the product components have been pre-assembled in the factory, and were split at the time of delivery.
2.1, The installation notes:
1), Cement silo body at the scene before the installation, should the basis of two level elevation measurement equipment, For the same silo-based large error according to the low elevation of the highest point cushion of protection should be high, The ultimate goal is to ensure that the vertical placement of the center of bulk cement silo, the central axis of tilt may not appear.
2), Cement silo body set at the time of delivery of technology support, should be pre-installed to remove.
3), When placed at the level of the ontology of cement silo can be assembled components should be assembled as much as possible, After the bolt to fix in silo up on the silo before may not have staff activities in order to avoid danger.
4), A storage bin, bin due to the location of the feed ingredients and ladder position limits, the basis of the relative orientation of the two devices is slightly different, the installation should be paid attention to.
5), The electrical part of cement warehouse system used in addition to external vibration motor safe operation of voltage DC24V, But still don't live in the wiring and the maintenance of the operation, in order to avoid the burning of components caused by the short circuit fault occurred in the process of operation.

 

3, Equipment operation, and maintenance of:
This machine is the key equipment in the coating system, belonging to the project Therefore, the machine operation, maintenance, maintenance work must be given full attention, should strictly prevent the operation, maintenance, damage caused by improper maintenance of equipment.
3.1 Operation points for attention
3.1. 1 Equipment generally used when debugging or maintenance, the local operation But the silo entrance of butterfly valve is generally in the trucks on the scene after the operation is complete, less likely to use the remote operation;
3.1. 2 The equipment should be paid attention to in the process of feeding less chance of safety valve (Act) and other police action, when it was discovered when the police should be to confirm the location and cause of alarm;
3.2 Maintenance and repair
3.2. 1 Should always check the below silo cone if there's any loose bolt vibrating motor, it is found that timely tighten loose, otherwise it will lead to the vibration of motor fault;
3.2. 2 As a result of on-site air humidity is high, Roof scrubber in the position of the air outlet set up the damp air, blocking device In will minimize the influence of humid air on dust removal system But still the top of inspection should be monthly dust out of the air system is smooth, filter bag is the appearance of the stick material or hardening;
3.2. 3 When there is failure or failure of control action and should be made by a professional electric technician and repair, and other non-operation of qualified personnel must not open the box cover.
3.3'S overhaul matters needing attention
3.3. 1 Operation box inside the high-voltage power supply, non-professionals not to be opened.
3.3. 2 On the operation of electric part of equipment outage maintenance must be carried out, in order to ensure the safety of maintenance personnel.
3.3. When carrying out maintenance works within 3 when you need to enter the tube, At the same time, the power must also be in accordance with the implementation of maintenance and operation specification of limited space and into the interior of the cylinder must be fasten your seat belt.


Advantage

Order

Name:
Linkman:
Tel:
Address:
E-mail:
Notes:
Verification:
Hotline:

400-1898-088 0373-5597320

Address:west section of Taihang north road, Xinxiang economic development zone

Linkman:Zhang manager 15737355722

Tel:0373-5597320 Fax:0373-5597339

E-mail:jinte2000@163.com

web_url:http://www.paulmartinezmusic.com

Next article: 没有下一条了
Address:west section of Taihang north road, Xinxiang economic development zone
Free hotline:400-1898-088 Sales hotline:0373-5597320 Linkman:Zhang manager Mobile:15737355722
Tel:0373-5597320 Fax:0373-5597339
400-1898-088 0373-5597320

Copyright:Henan Kinter Vibrating Machinery Co. Ltd. 大发彩票 TEL:0373-5597320 E-mail:jinte2000@163.com 【Admin】